Took advantage of a rainy/windy morning on Maui to attend General Manager Bill Countryman's weekly property update for owners. A lot of great information was shared. Here is a summary:
State DLNR Beach Renourishment
This is the project where the State Department of Land and Natural Resources (DLNR) is partnering with the Kaanapali Resort Association to transport 75,000 cubic yards of sand by barge from a sandy area off shore from Black Rock and redistribute it along south Kaanapali from Canoe Beach below the Hyatt all the way to the Sheraton. As recently as December, this project was slated for fall 2024, but after seeing the severe erosion on Kaanapali from last summer, DLNR decided to accelerate the project by a year. The project is now scheduled to take place in the fall of 2023 - from October 1st thru December 15th, 7 days a week from 6am-6pm. The sand will be dropped in several places along the beach - including one near MOC and the Hyatt - and spread by bulldozers and other equipment. Countryman did say that there is still a small group of locals dedicated to stopping the project, but he seemed confident that support from the Mayor and DLNR was strong enough that it will get done.
Kaanapali Beach Walk Repairs
Restoring the beach walk damaged last summer in front of the Kaanapali Ali'i is still under review. Countryman said the Ali'i is required by the resort association rules to restore a walking path, subject to any necessary approvals. Several options are being discussed, including an elevated boardwalk.
The Boat
They are still working with the insurer and the salvage company to get the boat removed from the beach in front of MOC. The local opposition group was successful in blocking the plan to transport it to the public Canoe Beach below the Hyatt, so they are now finalizing a plan to bring it off through the MOC private property near Napili Tower. He didn't mention when, but it seemed like it might happen soon, pending an upcoming site review by the contractor.
2023 MOC Projects
- The Main Electrical system for MOC 1 (original towers) including switches and transformers will be replaced this fall. The MOC 1 Towers will be under hospital-grade generator power 24/7 for two months during the final conversion.
- They are finalizing a new contract with Starbucks that will result in a major renovation to the Starbucks space later this year.
- All 18 public restrooms will be renovated this year
- By Mid-March they will open the Kealani Juice Truck on the Napili Lawn
2024-2025 MOC Projects
- MOC 1 full villa renovation and plumbing/drain line replacement will take place between June 1, 2024 and June 30, 2025. Groups of units will be taken offline in phases during this time, so expect reservations to get tougher during this period. The plumbing work includes replacing all of the drain/sewer lines from the units to the main lines and will require cutting into unit walls and floors. As a result, the bathrooms will be totally redone, with new sinks tubs, and now, walk-in showers. A 2BR unit will still have three bathrooms, but the Master bath will get a new shower instead of a tub. He said the renderings of the new bathroom are awaiting approval by Marriott International brand standards, so he couldn't share them yet. He expects a spring President's Newsletter in April or May should have full renderings. The new flooring will be luxury vinyl instead of tile. This renovation will include both hard goods and soft goods in addition to the bathroom reconstruction and flooring. The proposed assessments outlined in the December 2022 President's Letter are still probable, although exact timing and precise amounts will not be finalized until the bids are in on the plumbing work. The Board will be addressing this at an April 2023 meeting.
- The MOC 1 roof will be replaced starting in December 2024, but that could slip into 2025, and will take one year.
2025-2026 Projects
- MOC 2 (Lahaina/Napili) will get a soft goods refurbishment starting in August 2025 and work will extend into 2026. After this MOC 2 refurb and the preceding MOC 1 refurb, all phases will be aligned with furnishings and soft/hard goods decor.
Future Kitchen Refurb/Cooktops in MOC 1
The completion of the electrical switch replacement that will take place this coming fall will clear one hurdle to adding a small two-burner cooktop in MOC 1 as the electrical systems will then be able to accommodate it. The other hurdle is that adding a cooktop will require the countertops/cabinetry to be modified, so that needs to wait until the normal scheduled appliance/cabinet/countertop replacement cycle, which is currently planned for 2028. They have begun reserving funds for the two-burner cooktops to be added at that time.
Here are some renderings that were shared of the new proposed Living/Dining Room and the Master Bedroom renovation:
State DLNR Beach Renourishment
This is the project where the State Department of Land and Natural Resources (DLNR) is partnering with the Kaanapali Resort Association to transport 75,000 cubic yards of sand by barge from a sandy area off shore from Black Rock and redistribute it along south Kaanapali from Canoe Beach below the Hyatt all the way to the Sheraton. As recently as December, this project was slated for fall 2024, but after seeing the severe erosion on Kaanapali from last summer, DLNR decided to accelerate the project by a year. The project is now scheduled to take place in the fall of 2023 - from October 1st thru December 15th, 7 days a week from 6am-6pm. The sand will be dropped in several places along the beach - including one near MOC and the Hyatt - and spread by bulldozers and other equipment. Countryman did say that there is still a small group of locals dedicated to stopping the project, but he seemed confident that support from the Mayor and DLNR was strong enough that it will get done.
Kaanapali Beach Walk Repairs
Restoring the beach walk damaged last summer in front of the Kaanapali Ali'i is still under review. Countryman said the Ali'i is required by the resort association rules to restore a walking path, subject to any necessary approvals. Several options are being discussed, including an elevated boardwalk.
The Boat
They are still working with the insurer and the salvage company to get the boat removed from the beach in front of MOC. The local opposition group was successful in blocking the plan to transport it to the public Canoe Beach below the Hyatt, so they are now finalizing a plan to bring it off through the MOC private property near Napili Tower. He didn't mention when, but it seemed like it might happen soon, pending an upcoming site review by the contractor.
2023 MOC Projects
- The Main Electrical system for MOC 1 (original towers) including switches and transformers will be replaced this fall. The MOC 1 Towers will be under hospital-grade generator power 24/7 for two months during the final conversion.
- They are finalizing a new contract with Starbucks that will result in a major renovation to the Starbucks space later this year.
- All 18 public restrooms will be renovated this year
- By Mid-March they will open the Kealani Juice Truck on the Napili Lawn
2024-2025 MOC Projects
- MOC 1 full villa renovation and plumbing/drain line replacement will take place between June 1, 2024 and June 30, 2025. Groups of units will be taken offline in phases during this time, so expect reservations to get tougher during this period. The plumbing work includes replacing all of the drain/sewer lines from the units to the main lines and will require cutting into unit walls and floors. As a result, the bathrooms will be totally redone, with new sinks tubs, and now, walk-in showers. A 2BR unit will still have three bathrooms, but the Master bath will get a new shower instead of a tub. He said the renderings of the new bathroom are awaiting approval by Marriott International brand standards, so he couldn't share them yet. He expects a spring President's Newsletter in April or May should have full renderings. The new flooring will be luxury vinyl instead of tile. This renovation will include both hard goods and soft goods in addition to the bathroom reconstruction and flooring. The proposed assessments outlined in the December 2022 President's Letter are still probable, although exact timing and precise amounts will not be finalized until the bids are in on the plumbing work. The Board will be addressing this at an April 2023 meeting.
- The MOC 1 roof will be replaced starting in December 2024, but that could slip into 2025, and will take one year.
2025-2026 Projects
- MOC 2 (Lahaina/Napili) will get a soft goods refurbishment starting in August 2025 and work will extend into 2026. After this MOC 2 refurb and the preceding MOC 1 refurb, all phases will be aligned with furnishings and soft/hard goods decor.
Future Kitchen Refurb/Cooktops in MOC 1
The completion of the electrical switch replacement that will take place this coming fall will clear one hurdle to adding a small two-burner cooktop in MOC 1 as the electrical systems will then be able to accommodate it. The other hurdle is that adding a cooktop will require the countertops/cabinetry to be modified, so that needs to wait until the normal scheduled appliance/cabinet/countertop replacement cycle, which is currently planned for 2028. They have begun reserving funds for the two-burner cooktops to be added at that time.
Here are some renderings that were shared of the new proposed Living/Dining Room and the Master Bedroom renovation: