We are at the Hacienda del Mar this week (on an Interval exchange) and can give an update. The hotel being demolished (the Hyatt Regency Cerromar Beach Hotel) shut down in 2003. The property was bought in 2014/2015 by Marriott and is to become a JW Marriott and Marriott Vacation Club. Demolition started in 2015 and based on the rate of demolition we've seen this week, we would estimate at least another year or two until the bldgs are fully demolished and rubble removed. We've traveled to Caribbean islands for years and would estimate completion of the JW and MVC to be 2027 or later.
On another note about this week....lost (most) electric after first day (Sat) and still w/o electric. There are less than 15 units being occupied this week and after an engineering check of other 2BR villas, we could move from a 7th floor unit to a 1st floor unit, which has full electric throughout the villa. Blame has been cast on privatization of PR's electrical grid. Certain low voltage items work in our 2BR villa, including refrigerator where a good amount of food purchased at the grocery store remains safe from spoiling. However, we have no way to cook any of it. Microwave and stove don't work and the villas have no A/C...and the resort isn't able to tell us when electric to resort will be fully restored. We continue to be told it's not a resort issue and that they are in contact with the electric company. We truly hope whatever the issue is or who the responsible party is has a fix by end of week because we've been told the resort is at full capacity the week of Thanksgiving (next week).
Attached are pics (JPG converted to PDF since JPGs wouldn't load) of the demolition site and the sign indicating an incoming JW and MVC.
The resort itself is nice and we would return, but after jack hammers and other construction equipment are gone.