At long last the permits have been received to start construction of the new Cafe Pointe at Cypress Pointe Resort! Also, the installation of the new lightning protection poles has begun.
For a look at the photos of the activity at the resort this week, clck the link below:
http://cypresspointe.net/Graphics/042508/CafeLight42608.htm
Per Prez John Chase, there is still no action on the recreation area as the permit needed to restart construction still shows "pending" status. We have been told it was approved but until that status changes work cannot resume.
Best regards,
Stu Schwartz, Director & Treasurer
CPR@LBV Condo. Ass'n
For a look at the photos of the activity at the resort this week, clck the link below:
http://cypresspointe.net/Graphics/042508/CafeLight42608.htm
Per Prez John Chase, there is still no action on the recreation area as the permit needed to restart construction still shows "pending" status. We have been told it was approved but until that status changes work cannot resume.
Best regards,
Stu Schwartz, Director & Treasurer
CPR@LBV Condo. Ass'n
Last edited: