• The TUGBBS forums are completely free and open to the public and exist as the absolute best place for owners to get help and advice about their timeshares for more than 30 years!

    Join Tens of Thousands of other Owners just like you here to get any and all Timeshare questions answered 24 hours a day!
  • TUG started 30 years ago in October 1993 as a group of regular Timeshare owners just like you!

    Read about our 30th anniversary: Happy 30th Birthday TUG!
  • TUG has a YouTube Channel to produce weekly short informative videos on popular Timeshare topics!

    Free memberships for every 50 subscribers!

    Visit TUG on Youtube!
  • TUG has now saved timeshare owners more than $21,000,000 dollars just by finding us in time to rescind a new Timeshare purchase! A truly incredible milestone!

    Read more here: TUG saves owners more than $21 Million dollars
  • Sign up to get the TUG Newsletter for free!

    60,000+ subscribing owners! A weekly recap of the best Timeshare resort reviews and the most popular topics discussed by owners!
  • Our official "end my sales presentation early" T-shirts are available again! Also come with the option for a free membership extension with purchase to offset the cost!

    All T-shirt options here!
  • A few of the most common links here on the forums for newbies and guests!

HSH 2018 Renovations

bdh

TUG Member
Joined
Aug 12, 2006
Messages
782
Reaction score
196
Points
403
With as tight lipped as Hyatt is with everything, was wondering what was happening at Sunset Harbor with the resort renovation project. Saw that KAL has a project photo page on his website. http://bywindkal.com/Hyatt/HSH2018.html

From the looks of things, there's a lot of action inside and outside the units! The Office to Pool Walkway photos show progress in the work as they're obviously taken over several days. From the looks of the one interior photo, the finished product looks like its going to be VERY nice.

A few other renovation notes:
  • When working in tight quarters, storage space is at a premium. ie: the Pool Furniture Storage photos.
  • The unit furniture (bed frame, mattress and chairs) stored outside on the walkways looks a little unorthodoxed - or maybe that's KW?
  • Interior renovation for Building 1 was finishing up on Monday, 7/9. So started demo on the interior of Building #2. Hopefully the learning curve from Building 1 kicks in and the renovation of Building 2 moves a little quicker - if not, the mid-September project completion date could be a little overly optimistic
  • The office walkway fountain has been removed and there's a palm tree in its location. (Thank God that there's no fire pit in its place!)
  • The new pool deck walkways and gazebo flooring is supposed to be complete on 7/18 - from the looks of it, that may also be a little overly optimistic.
  • The grills look like there going to be permanently removed from their building 5 location - no idea where they're going to replant them.
If the exterior pool deck reno runs over a few days, wouldn't expect that to be a big deal. But if the interior unit reno runs over, expect there to be some red butts on that one.
 

TBipp

TUG Review Crew
TUG Member
Joined
Aug 16, 2014
Messages
81
Reaction score
23
Points
118
Location
Missouri
Resorts Owned
Hyatt Beach House and Windward Pointe, Key West, FL
The Banyan Resort, Key West, FL
Thank you for posting--we will be staying at Sunset Harbor in November. Maybe we will get a renovated room?!
 

bdh

TUG Member
Joined
Aug 12, 2006
Messages
782
Reaction score
196
Points
403
Thank you for posting--we will be staying at Sunset Harbor in November. Maybe we will get a renovated room?!

If the unit you get in November isn't renovated, expect there would be red faces at Hyatt and red butts on contractors.
 

IslandTime

TUG Member
Joined
Jun 20, 2011
Messages
187
Reaction score
54
Points
239
Location
Florida
Resorts Owned
Hyatt Sunset Harbor
This is awesome, thanks for posting! Can't wait to see the new bathrooms in December.
 

AJCts411

TUG Member
Joined
Apr 4, 2017
Messages
953
Reaction score
850
Points
203
Resorts Owned
Hyatt Sunset x 2
I Sure hope a that the work will be complete as they scheduled. Now for a mission critical question...what coffee makers do they have? Still the filter and pot..or K-Cup...
 

bdh

TUG Member
Joined
Aug 12, 2006
Messages
782
Reaction score
196
Points
403
The
I Sure hope a that the work will be complete as they scheduled. Now for a mission critical question...what coffee makers do they have? Still the filter and pot..or K-Cup...

The pool is open now, however haven't finished the deck at the hot tub/spa area or the deck area adjacent to building 5. As far as interior work goes, their only half way done with that task. Sounds like their moving at KW speed.
 

Kal

TUG Member
Joined
Jun 6, 2005
Messages
4,412
Reaction score
521
Points
499
Location
Redmond, WA
I Sure hope a that the work will be complete as they scheduled. Now for a mission critical question...what coffee makers do they have? Still the filter and pot..or K-Cup...
With all the costs of the renovations, Sunset Harbor might be considering a "time-proven" alternate:
Percolator.jpg
 

AJCts411

TUG Member
Joined
Apr 4, 2017
Messages
953
Reaction score
850
Points
203
Resorts Owned
Hyatt Sunset x 2
Well...maybe...this is in "OLD" Key West.
 

TBipp

TUG Review Crew
TUG Member
Joined
Aug 16, 2014
Messages
81
Reaction score
23
Points
118
Location
Missouri
Resorts Owned
Hyatt Beach House and Windward Pointe, Key West, FL
The Banyan Resort, Key West, FL
We own at Beach House and I sent in a suggestion for a combination K Cup and coffee maker. I didn't know if such an appliance existed and it does. I think it makes a lot of sense when you have a group that all enjoys a pot of coffee but yet if only one person drinks coffee, you have the option of the K cup. Or, the option of a cup with or without caffeine if a pot is made for the group.
 

AJCts411

TUG Member
Joined
Apr 4, 2017
Messages
953
Reaction score
850
Points
203
Resorts Owned
Hyatt Sunset x 2
Would another owner have an update on the progress of the renovations at Sunset. Heading there wk 39/40 (400 and 200 block)...5 weeks away. Is the pool deck done? Renovation done/ noise? When the renovations were announced I believe they said end of Aug as a completion date. Are they close?
 

bdh

TUG Member
Joined
Aug 12, 2006
Messages
782
Reaction score
196
Points
403
Would another owner have an update on the progress of the renovations at Sunset. Heading there wk 39/40 (400 and 200 block)...5 weeks away. Is the pool deck done? Renovation done/ noise? When the renovations were announced I believe they said end of Aug as a completion date. Are they close?

Completion was originally scheduled for Sept 30 - as of two weeks ago, they were still saying Sept 30 completion. With your units being Building 4 and 2, you'll be ok - the reno work in Bldg 2 has already been completed and the work in Bldg 4 is headed for the finish line. People with units in Building 5 will be the ones that are closely watching the Sept 30 deadline.
 

AJCts411

TUG Member
Joined
Apr 4, 2017
Messages
953
Reaction score
850
Points
203
Resorts Owned
Hyatt Sunset x 2
Thanks, good to hear...for me at least.
 

dbmarch

TUG Member
Joined
Feb 11, 2012
Messages
151
Reaction score
2
Points
228
Location
Deerfield Beach, FL
Resorts Owned
Hyatt Sunset Harbor
Hyatt Windward Pointe
We were just there the week of Aug 19. The pool is open but the hot tub is roped off. The stage ( aka smoking area) is blocked off. They seem to have a lot of work started outside (roped off) but nobody worked on it the week we were there. (Not sure why they started work everywhere at once). There were a handful of people working in building 4. Our unit in building 1 was already remodeled. It's nicer but the workmanship was 'ok'. Our unit in Windward Pointe is fixed up nicer.

Attaching photos from our trip. (outside)
20180826_085635.jpg
20180826_085650.jpg
20180826_085641.jpg
20180826_085705.jpg
20180826_085707.jpg
20180826_085742(0).jpg
20180826_085751.jpg
 

Attachments

  • 20180826_085732.jpg
    20180826_085732.jpg
    135.5 KB · Views: 100
  • 20180826_085756.jpg
    20180826_085756.jpg
    91.9 KB · Views: 93
  • 20180826_085802.jpg
    20180826_085802.jpg
    111.3 KB · Views: 111

bdh

TUG Member
Joined
Aug 12, 2006
Messages
782
Reaction score
196
Points
403
We were just there the week of Aug 19. The pool is open but the hot tub is roped off. The stage ( aka smoking area) is blocked off. They seem to have a lot of work started outside (roped off) but nobody worked on it the week we were there. (Not sure why they started work everywhere at once). There were a handful of people working in building 4. Our unit in building 1 was already remodeled. It's nicer but the workmanship was 'ok'. Our unit in Windward Pointe is fixed up nicer.

Other than your 3rd photo of the new walkway heading towards the main office being taken from the opposite end of the photo on KAL's site, the progress doesn't look too much different than the early July photo. http://bywindkal.com/Hyatt/HSH2018photos/Office to Pool Walkway 3.html
 

bdh

TUG Member
Joined
Aug 12, 2006
Messages
782
Reaction score
196
Points
403
Sept 30 was the scheduled renovation completion date - however the target is now Oct 15. The spa is still closed and the walkway from the front office out to the pool is also closed -sounds like they've resubmitted plans to the City to widen the walkway to the spa and put in a fire pit at the office walkway. (Still don't believe that their putting in a fire pit!).

They're also still working on Building 5 interior renovations - the official date for that completion is Oct 20. So expecting that some deeded week 39, 40 and 41 owners in Building 5 are getting bumped to another unit.
 

Sapper

Tug Review Crew: Rookie
TUG Member
Joined
Oct 12, 2016
Messages
1,199
Reaction score
753
Points
223
Location
Houston, TX
... and put in a fire pit at the office walkway. (Still don't believe that their putting in a fire pit!).
.

Maybe they are going to put in a fire spit (some one in the planning office left the "s" off the front end) and roast pigs on it. ;)
 

AJCts411

TUG Member
Joined
Apr 4, 2017
Messages
953
Reaction score
850
Points
203
Resorts Owned
Hyatt Sunset x 2
Just returned from a week. walkways, spa...look the same as the above pics. Rumor was Oct 7th for building 5, and 15 for the deck/walkways...which seems impossible.
 

TBipp

TUG Review Crew
TUG Member
Joined
Aug 16, 2014
Messages
81
Reaction score
23
Points
118
Location
Missouri
Resorts Owned
Hyatt Beach House and Windward Pointe, Key West, FL
The Banyan Resort, Key West, FL
I’m at HSH now. Pool is open but a lot of construction going on around the pool. It looks like the finish date is quite a bit down the road. And, YES they are installing a fire pit. There are several resorts that have them so the Board decided to install one. BBQ pit being relocated and will have permanent gas line. There will be a larger area for laying out. We are in Biilding 5. Does not seem renovated and kitchen floor has chunks out of it.
 

IslandTime

TUG Member
Joined
Jun 20, 2011
Messages
187
Reaction score
54
Points
239
Location
Florida
Resorts Owned
Hyatt Sunset Harbor
We checked out of 231A (lockoff) this morning. The bathroom reno is very nice. I wish they had painted the bedroom to match the soothing pale color in the bathroom. The bedroom is still the old baby poop yellow color and looks pretty worn in comparison.

We sat at a table on the deck where the swing is for a few hours one day and worked remotely. We didn't see any work on the deck area by the pool at all last week but didn't hang out at the resort much during the day.
 

Cropman

TUG Member
Joined
Mar 5, 2016
Messages
157
Reaction score
65
Points
138
Location
Harrison, MI
At Sunset now. It is unbelievable how slow the construction moves along. I’m betting this won’t be done until snowbird season is over. I’m just wondering what kind of pressure is being put on them by the resort/board/or others. I don’t think it’s much by the pace of it all.
 

Kal

TUG Member
Joined
Jun 6, 2005
Messages
4,412
Reaction score
521
Points
499
Location
Redmond, WA
Just remember, it's Key West where it takes forever to get anyone interested in doing anything. But that should not be a surprise to the people managing the work. I would wager that the contract does not have any penalty provisions for not meeting specific completion dates.

What would a homeowner do if the contractor work was completed 5-6 months late?? (or maybe 12 months late:wall:)
 

ivywag

TUG Member
Joined
Jan 22, 2011
Messages
360
Reaction score
112
Points
253
Location
Northern California
At Sunset now. It is unbelievable how slow the construction moves along. I’m betting this won’t be done until snowbird season is over. I’m just wondering what kind of pressure is being put on them by the resort/board/or others. I don’t think it’s much by the pace of it all.
We're heading to HSH the second week in March. I thought for sure that the renovations would be done by then. Disappointing! Any recommendations for which units to request? (renovations completed)
 

Cropman

TUG Member
Joined
Mar 5, 2016
Messages
157
Reaction score
65
Points
138
Location
Harrison, MI
We're heading to HSH the second week in March. I thought for sure that the renovations would be done by then. Disappointing! Any recommendations for which units to request? (renovations completed)

I think all the units are done. It’s all the work around the outside that taking forever.
 

Attachments

  • 92A81BC1-C82E-48EF-9824-DF04AD87489A.jpeg
    92A81BC1-C82E-48EF-9824-DF04AD87489A.jpeg
    168.6 KB · Views: 77
  • 2A7B9DBB-3FE1-491E-9D8F-67D9FA1B0165.jpeg
    2A7B9DBB-3FE1-491E-9D8F-67D9FA1B0165.jpeg
    188.6 KB · Views: 107

AJCts411

TUG Member
Joined
Apr 4, 2017
Messages
953
Reaction score
850
Points
203
Resorts Owned
Hyatt Sunset x 2
I think all the units are done. It’s all the work around the outside that taking forever.

From your pictures it looks like they have torn out previously uncompleted new construction on the deck/walkways. Owners should be demanding answers, because not one project ever in the universe got cheaper as the project lagged. So who's paying for these over runs?
 

bdh

TUG Member
Joined
Aug 12, 2006
Messages
782
Reaction score
196
Points
403
All work on the unit interiors and the wood deck replacement on the hallways & balconies outside the units was completed mid-October. Then construction work on the wood walkways around the pool/hot tub and the fire pit stopped for 3 months due to permitting issues with the city.

Since they restarted work on the pool area wood walkways, there has been a handful of "do-overs" on the wood walkway framing and post installation relocation. If the do-overs are contractor error, the contractor eats it - if the do-overs are a result of design changes, they get paid extra for the additional work. There hasn't been enough framing and post relocation to get excited about the cost either way.

However the resetting of all posts as a result of the permit issue is the bigger question. Original plans called for direct burial of the posts in the ground. While approval for the project had been granted by the City in 2018, the topic of the post installation method was somehow revisited by the City. The City requirement that post installation be revised from direct burial to posts being mechanically fastened to a galvanized steel anchor set in concrete was a game changer. Who pays for that "aw crap" is the question.

Wood framing was completed today and City inspection is scheduled for tomorrow. Once approval of the framing is provided by the City, the crew installing the decking can start. The deck installation will go fairly fast, however the installation of new railings (and painting) well take a little bit of time.

While things in Key West are kind of like a baseball game where there is no time limit, the expectation is that full completion won't be till mid March.
 