We were there last week, they were supposed to drill test holes for pilings over a two day period that never happened. All we saw was a bulldozer moving dirt that created very little noise. The GM told us that the test holes would determined the method that they would use to drill the rest, could be anything from an Auger (low noise) to a hammer, (lots of noise).